{"id":4353,"date":"2021-12-21T11:29:16","date_gmt":"2021-12-21T16:29:16","guid":{"rendered":"https:\/\/projectmanagementacademy.net\/resources\/?p=4353"},"modified":"2022-12-01T19:50:19","modified_gmt":"2022-12-02T00:50:19","slug":"introduction-to-risk-breakdown-structure-pmp","status":"publish","type":"post","link":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/","title":{"rendered":"Introduction to Risk Breakdown Structure PMP"},"content":{"rendered":"\n<p>Since every project comes with risks, every project manager should be well versed in the risk management process. Risk management involves identifying, assessing, and managing risks using established industry guidelines and best practice standards. Identifying risks can help project managers produce a list of all known potential risks. However, this list doesn\u2019t help you decide where and how to prioritize risk management. For a Project Management Professional (PMP), a risk breakdown structure can help them better assess, understand, and organize a project\u2019s risk exposure as a whole.<\/p>\n\n\n\n<p>Use this Project Management Academy guide to the PMP exam risk breakdown structure (RBS) concept to <a href=\"https:\/\/www.pmi.org\/certifications\/project-management-pmp\" target=\"_blank\" rel=\"noreferrer noopener\">support your project management expertise<\/a>.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>On this page:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#introduction\">Introduction to Risk Breakdown Structure PMP<\/a><\/li><li><a href=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#how\">How to use the RBS in a Project?<\/a><\/li><li><a href=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#examples\">Examples of RBS<\/a><\/li><li><a href=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#summary\">Summary<\/a><\/li><\/ul>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-core-columns-is-layout-2 wp-block-columns-is-layout-flex\" style=\"background-color:#e9f7ff\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:40%\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"791\" height=\"1024\" src=\"https:\/\/e360-media.s3.amazonaws.com\/2022\/09\/01193044\/Ultimate-Guide-to-Risk-Management-791x1024.png\" alt=\"Ultimate Guide to Risk Management\" class=\"wp-image-7282\" srcset=\"https:\/\/e360-media.s3.amazonaws.com\/2022\/09\/01193044\/Ultimate-Guide-to-Risk-Management-791x1024.png 791w, https:\/\/e360-media.s3.amazonaws.com\/2022\/09\/01193044\/Ultimate-Guide-to-Risk-Management-232x300.png 232w, https:\/\/e360-media.s3.amazonaws.com\/2022\/09\/01193044\/Ultimate-Guide-to-Risk-Management-768x994.png 768w, https:\/\/e360-media.s3.amazonaws.com\/2022\/09\/01193044\/Ultimate-Guide-to-Risk-Management.png 850w\" sizes=\"auto, (max-width: 791px) 100vw, 791px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<div style=\"height:48px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><\/p>\n\n\n\n<p class=\"has-medium-font-size\" id=\"block-eef25254-e22e-41f6-826b-cab064e3d095\"><strong>Get Your Comprehensive Guide to Risk Management<\/strong><\/p>\n\n\n\n<p id=\"block-14690051-2796-4b03-bcb7-95d54bd01fcd\"><em>Learn how to manage risk in every project.<\/em><\/p>\n\n\n\n\n\t\t\t\t\t<script>\n\t\t\t\t\t\thbspt.enqueueForm({\n\t\t\t\t\t\t\tportalId: 3294842,\n\t\t\t\t\t\t\tformId: \"05ade5e2-a78b-40d4-9daf-a391639b4340\",\n\t\t\t\t\t\t\ttarget: \"#hbspt-form-1775305902000-5262706232\",\n\t\t\t\t\t\t\tregion: \"na1\",\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t});\n\t\t\t\t\t<\/script>\n\t\t\t\t\t<div class=\"hbspt-form\" id=\"hbspt-form-1775305902000-5262706232\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:10%\">\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"introduction\">Introduction to Risk Breakdown Structure PMP<\/h2>\n\n\n\n<p>When should you use \u201cRBS\u201d vs. \u201cRiBS\u201d? RiBS is sometimes used because RBS can also refer to Resource Breakdown Structure. However, the <a href=\"https:\/\/www.pmi.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project Management Institute<\/a> (PMI) prefers to use \u201cRBS\u201d when referring to a risk breakdown structure.<\/p>\n\n\n\n<p>A risk breakdown structure is a PMP exam-related document representing information about project risks. This tool makes it easier to capture and understand project risk data. In turn, this data helps organize any risk management work required to accomplish project objectives efficiently.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is a Risk Breakdown Structure (RBS)?<\/h3>\n\n\n\n<p><a href=\"https:\/\/www.pmi.org\/learning\/library\/risk-breakdown-structure-understand-risks-1042\" target=\"_blank\" rel=\"noreferrer noopener\">According to PMI<\/a>, in PMP exam terms, a risk breakdown structure is:<\/p>\n\n\n\n<p>\u201cA source-oriented grouping of project risks that organizes and defines the total risk exposure of the project. Each descending level represents an increasingly detailed definition of sources of risk to the project.\u201d<\/p>\n\n\n\n<p>In other words, an RBS is a type of organization breakdown structure (OBS) that provides the following information:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>A list of project risks with information organized from the highest to the lowest level<\/li><li>Individual risks grouped by risk source<\/li><li>Defined total risk exposure for the project<\/li><li>Multiple levels of information with a corresponding increase in detail<\/li><\/ul>\n\n\n\n<p>A simple list of project risks lacks organization and depth of information. Ultimately, that simple list can add to the chaos or get lost in the shuffle. An RBS is a better solution that provides a hierarchy with multiple organization levels to promote effective risk management.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why an RBS is important for your project<\/h3>\n\n\n\n<p>A risk breakdown structure helps provide organization and structure to your list of risks, making it an invaluable tool in understanding the potential risks your project may face. You can use the RBS to guide your risk management decisions and mitigate risks more efficiently.<\/p>\n\n\n\n<p>Without an RBS, it can be challenging to keep track of all your potential risk sources and priority levels. The lack of organization and detail can expose you to otherwise avoidable or manageable risks.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">When is Risk Breakdown Structure Created PMP<\/h3>\n\n\n\n<p>Create your RBS chart during the Project Risk Identification process. Since it is never too early to start thinking about project risks, this process should occur in the project\u2019s early stages. Project managers are typically responsible for creating and updating this document, but the RBS can also delegate other responsibilities related to project risks.<\/p>\n\n\n\n<p>Risk management should be ongoing through the entire project life cycle. Once you create your RBS, you should be using it throughout the whole project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how\">How to use the RBS in a Project?<\/h2>\n\n\n\n<p>An RBS has many potential use cases for all project stages. Here are some ways you can use the RBS in a project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Use the RBS to identify risks<\/h3>\n\n\n\n<p>Lead your project team through risk identification activities using the RBS as a guide, such as brainstorming and organizing project risks by source or risk area. An RBS can also help you develop a checklist of generic risks for future projects based on past experiences. Having a clear and organized list of risks prevents the chance of overlooking any risks, risk sources, or other blind spots.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Use the RBS to assess risks<\/h3>\n\n\n\n<p>The lower levels of detail in an RBS can help you assess and prioritize risks. For example, one risk area may have a higher total number of risks, or another may have fewer but more critical risks. With this information, your RBS can provide insights into types of risk exposures, the most significant risk sources, risk relationships, and more.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Use the RBS to compare projects<\/h3>\n\n\n\n<p>Comparing projects can be challenging. An RBS provides common ground between projects so you can compare elements directly. You can use these project comparisons to choose which projects to pursue or prioritize your resources based on the relative risk exposures of each project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Use the RBS for risk reporting<\/h3>\n\n\n\n<p>An RBS is an excellent tool for both high-level and detailed reporting. Whether reporting to senior management, clients, project team members, or other stakeholders, an RBS provides organized information about total risks and risk scores, risk responses, and more. Since you can use the RBS to compare projects, you can also use it for cross-project reporting.<\/p>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\">\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Studying for the PMP Exam?<\/strong><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-horizontal is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-1 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-100 is-style-fill\"><a class=\"wp-block-button__link has-white-color has-text-color has-background\" href=\"https:\/\/projectmanagementacademy.net\/free-pmp-questions\" style=\"border-radius:2px;background-color:#366194\" target=\"_blank\" rel=\"noreferrer noopener\">PMP Practice Questions<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:8px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"examples\">Examples of RBS<\/h2>\n\n\n\n<p>Since every project, sector, and industry has a unique set of challenges and potential risks, we recommend tailoring your RBS to your organization\u2019s specific needs. You can use these sample RBS templates to start your own RBS chart.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">RBS for Software Development<\/h3>\n\n\n\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"442\" src=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110203\/Risk-Breakdown-Structure-1-1024x442.jpg\" alt=\"risk breakdown structure software\" class=\"wp-image-4354\" srcset=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110203\/Risk-Breakdown-Structure-1-1024x442.jpg 1024w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110203\/Risk-Breakdown-Structure-1-300x130.jpg 300w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110203\/Risk-Breakdown-Structure-1-768x332.jpg 768w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110203\/Risk-Breakdown-Structure-1.jpg 1326w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">RBS for Construction Design&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"431\" src=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110227\/Risk-Breakdown-Structure-2-1024x431.jpg\" alt=\"risk breakdown structure construction\" class=\"wp-image-4355\" srcset=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110227\/Risk-Breakdown-Structure-2-1024x431.jpg 1024w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110227\/Risk-Breakdown-Structure-2-300x126.jpg 300w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110227\/Risk-Breakdown-Structure-2-768x323.jpg 768w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110227\/Risk-Breakdown-Structure-2.jpg 1327w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">RBS for Generic Project<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"462\" src=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110242\/Risk-Breakdown-Structure-3-1024x462.jpg\" alt=\"generic risk breakdown structure\" class=\"wp-image-4356\" srcset=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110242\/Risk-Breakdown-Structure-3-1024x462.jpg 1024w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110242\/Risk-Breakdown-Structure-3-300x135.jpg 300w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110242\/Risk-Breakdown-Structure-3-768x347.jpg 768w, https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21110242\/Risk-Breakdown-Structure-3.jpg 1323w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"summary\">Summary<\/h2>\n\n\n\n<p>For the PMP exam, your understanding of risk breakdown structures should include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>What is a Risk Breakdown Structure?<\/li><li>When should project managers create an RBS?<\/li><li>Who is responsible for creating and updating an RBS?<\/li><li>How can you use an RBS?<\/li><\/ul>\n\n\n\n<p>If you understand this information about the PMP concept of an RBS, you are in great shape for the PMP exam. Do you have any other questions about risk breakdown structures or other PMP exam topics? <a href=\"https:\/\/projectmanagementacademy.net\/contact\" target=\"_blank\" rel=\"noreferrer noopener\">Reach out to your experts at the Project Management Academy today<\/a><\/p>\n\n\n\n<div style=\"height:45px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p style=\"font-size:25px\"><strong>Upcoming PMP Certification Training &#8211; Live &amp; Online Classes<\/strong><\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\"><table class=\"table table-striped table-bordered table-responsive-sm font-md mt-5 mb-0 d-none d-md-table\"><tr><td>Name<\/td><td>Date<\/td><td>Place<\/td><td><\/td><\/tr><\/table>\n<\/div><\/div>\n\n\n\n<p><\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:45px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since every project comes with risks, every project manager should be well versed in the risk management process. Risk management involves identifying, assessing, and managing risks using established industry guidelines and best practice standards. Identifying risks can help project managers produce a list of all known potential risks. However, this list doesn\u2019t help you decide [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4359,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[12,4,10],"tags":[],"class_list":["post-4353","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pmp-exam-prep","category-project-management","category-risk-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources<\/title>\n<meta name=\"description\" content=\"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources\" \/>\n<meta property=\"og:description\" content=\"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/\" \/>\n<meta property=\"og:site_name\" content=\"Project Management Academy Resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ProjectManagementAcademy.net\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-21T16:29:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-02T00:50:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"308\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kyle Puckett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PM_Academy\" \/>\n<meta name=\"twitter:site\" content=\"@PM_Academy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kyle Puckett\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/\",\"url\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/\",\"name\":\"Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources\",\"isPartOf\":{\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg\",\"datePublished\":\"2021-12-21T16:29:16+00:00\",\"dateModified\":\"2022-12-02T00:50:19+00:00\",\"author\":{\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/68bbacbe3d69e983543ed1d184a6cd82\"},\"description\":\"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.\",\"breadcrumb\":{\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage\",\"url\":\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg\",\"contentUrl\":\"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg\",\"width\":900,\"height\":308,\"caption\":\"intro to risk breakdown structure\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/projectmanagementacademy.net\/resources\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Introduction to Risk Breakdown Structure PMP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/#website\",\"url\":\"https:\/\/projectmanagementacademy.net\/resources\/\",\"name\":\"Project Management Academy Resources\",\"description\":\"Get the latest industry news, trends, and insights you need to be the most effective Project Manager.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/projectmanagementacademy.net\/resources\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/68bbacbe3d69e983543ed1d184a6cd82\",\"name\":\"Kyle Puckett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b2b4b0927c02229f63c6d1b77cd51e1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b2b4b0927c02229f63c6d1b77cd51e1?s=96&d=mm&r=g\",\"caption\":\"Kyle Puckett\"},\"url\":\"#molongui-disabled-link\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources","description":"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/","og_locale":"en_US","og_type":"article","og_title":"Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources","og_description":"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.","og_url":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/","og_site_name":"Project Management Academy Resources","article_publisher":"https:\/\/www.facebook.com\/ProjectManagementAcademy.net","article_published_time":"2021-12-21T16:29:16+00:00","article_modified_time":"2022-12-02T00:50:19+00:00","og_image":[{"width":900,"height":308,"url":"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg","type":"image\/jpeg"}],"author":"Kyle Puckett","twitter_card":"summary_large_image","twitter_creator":"@PM_Academy","twitter_site":"@PM_Academy","twitter_misc":{"Written by":"Kyle Puckett","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/","url":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/","name":"Introduction to Risk Breakdown Structure PMP - Project Management Academy Resources","isPartOf":{"@id":"https:\/\/projectmanagementacademy.net\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage"},"image":{"@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage"},"thumbnailUrl":"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg","datePublished":"2021-12-21T16:29:16+00:00","dateModified":"2022-12-02T00:50:19+00:00","author":{"@id":"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/68bbacbe3d69e983543ed1d184a6cd82"},"description":"For a PMP, a risk breakdown structure can help project managers better assess, understand, and organize a project\u2019s risk exposure as a whole.","breadcrumb":{"@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#primaryimage","url":"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg","contentUrl":"https:\/\/e360-media.s3.amazonaws.com\/2021\/12\/21112850\/risk-breakdown-structure.jpg","width":900,"height":308,"caption":"intro to risk breakdown structure"},{"@type":"BreadcrumbList","@id":"https:\/\/projectmanagementacademy.net\/resources\/blog\/introduction-to-risk-breakdown-structure-pmp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/projectmanagementacademy.net\/resources\/"},{"@type":"ListItem","position":2,"name":"Introduction to Risk Breakdown Structure PMP"}]},{"@type":"WebSite","@id":"https:\/\/projectmanagementacademy.net\/resources\/#website","url":"https:\/\/projectmanagementacademy.net\/resources\/","name":"Project Management Academy Resources","description":"Get the latest industry news, trends, and insights you need to be the most effective Project Manager.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/projectmanagementacademy.net\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/68bbacbe3d69e983543ed1d184a6cd82","name":"Kyle Puckett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/projectmanagementacademy.net\/resources\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b2b4b0927c02229f63c6d1b77cd51e1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b2b4b0927c02229f63c6d1b77cd51e1?s=96&d=mm&r=g","caption":"Kyle Puckett"},"url":"#molongui-disabled-link"}]}},"_links":{"self":[{"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/posts\/4353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/comments?post=4353"}],"version-history":[{"count":6,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/posts\/4353\/revisions"}],"predecessor-version":[{"id":7305,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/posts\/4353\/revisions\/7305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/media\/4359"}],"wp:attachment":[{"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/media?parent=4353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/categories?post=4353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectmanagementacademy.net\/resources\/wp-json\/wp\/v2\/tags?post=4353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}